71,053 EMF Survey and Testing sites done successfully during span of 4 months in bi-annual Survey year 2014-15.
68,0147 EMF Survey and Testing sites done successfully during span of 4 months in biannual Survey year 2012-13.
71,053 EMF Survey and Testing sites done successfully during span of 4 months in bi-annual Survey year 2014-15.
68,0147 EMF Survey and Testing sites done successfully during span of 4 months in biannual Survey year 2012-13.

Offshore Service Delivery

OPO (Offshore Planning & Optimization) is a Process & Knowledge driven system of Teleysia Networks. Its aim is to perform Radio/Transmission Planning & Network Optimization from a location that is remote to the Physical Project Location.

OPO is based on the simple FACT that planning & optimization scope is split into field and office work.

  • Field work (e.g. DT measurement collection, RF/TNP surveys) needs to be done at project location.
  • Office work (e.g. analysis of DT and OSS data, planning simulations and database updating) can be done remotely, as long as results are delivered in desired format.
  • Network Planning Tendering support
  • Nominal Planning & BoQ
  • Search Rings
  • Planning tool update
  • Site Parameter Planning
  • BSS Parameter verification & Audit
  • RF Optimization
  • Desktop Planning
  • Link Planning
  • PCM Planning
  • BSC Planning
  • Transmission Network Optimization